Caster Lids
Caster lids from one to many piece sets. Precision engineered and cast for longevity and durability in service.
Caster lids from one to many piece sets: lid sections and lid blocks cast to the drawing of each caster, in ARELCrete LC17T. Precision engineered and cast for longevity and durability in service.
Tundish preheater blocks are made as two-piece sets in ARELCrete LC17T, or in ARELCrete LC1600 with stainless steel needles.
We design and manufacture the steelwork for our caster lids here in Dudley too, in our own Fabrications Department. Nothing is outsourced: the steel and the refractory are designed, made and put together on one site.
Looked after on condition, not on the calendar
We refurbish and reline lids as well as make them. Each lid can be inspected, scanned for refractory loss, checked with a thermal camera in service and have its steelwork assessed, so it is refurbished when its measured condition says so, not at a fixed interval.

Caster ladle lids
We design, make and reline the lids that sit on the ladle at the caster, steelwork included. The refractory is cast as a dense, needle-reinforced perimeter with inner and centre segments, all rebated so that hot gas cannot pass to the steelwork, over an insulating backing layer.
What a lid is worth
An open ladle top radiates 60,000 to 80,000 W/m² from the slag surface. Our calculation for an insulated lid gives about 7,000 W/m², a reduction of roughly 88% to 91%. The table gives the estimated steel temperature kept over 30 minutes, against an open ladle.
A lid put on cold takes heat from the steel for the first 15 to 25 minutes, so a preheated lid does the most good.
- 100 tonne ladle
- 8 to 11 °C
- 150 tonne ladle
- 7 to 9.5 °C
- 250 tonne ladle
- 6 to 8 °C
The rest of the range.
Talk to our tundish team.
If you are reviewing your tundish practice, or you have a lining problem you have been living with, talk to our technical team.